Fouman Shimi Project

Fouman Shimi, Roudbar, Guilan Province – 2023 (1402)

The Fouman Shimi Project, executed in Roudbar, Guilan Province in 2023 (1402), was developed with the objective of constructing a durable, fully compliant industrial steel structure meeting the highest quality and safety standards.

This entirely bolted steel structure, with a total weight of 40 tons, was completed—including fabrication and installation—within only 30 days, demonstrating Lahij Souleh’s exceptional speed, precision, and logistical coordination.

Among the project’s notable technical highlights were the complete shot‑blasting of all steel surfaces to ensure optimal paint adhesion, and the application of three specialized protective coating layers designed to maximize resistance against corrosive and climatic conditions.

The Fouman Shimi Project stands as a successful example of the seamless integration of time management, structural quality, and rigorous adherence to industrial standards—a reflection of Lahij Souleh’s commitment to excellence in every operational stage.

Structure Location: Guilan, Rudbar

Structure Weight (tons): 40

Structure Type: Steel structure

Structure Usage: Industrial

Fabrication, Transportation & Installation: Lahij Souleh

Gallery

Latest Project Images

Gallery

Latest Project Images

Fouman Shimi, Roudbar, Guilan Province – 2023 (1402)

The Fouman Shimi Project, executed in Roudbar, Guilan Province in 2023 (1402), was developed with the objective of constructing a durable, fully compliant industrial steel structure meeting the highest quality and safety standards.

This entirely bolted steel structure, with a total weight of 40 tons, was completed—including fabrication and installation—within only 30 days, demonstrating Lahij Souleh’s exceptional speed, precision, and logistical coordination.

Among the project’s notable technical highlights were the complete shot‑blasting of all steel surfaces to ensure optimal paint adhesion, and the application of three specialized protective coating layers designed to maximize resistance against corrosive and climatic conditions.

The Fouman Shimi Project stands as a successful example of the seamless integration of time management, structural quality, and rigorous adherence to industrial standards—a reflection of Lahij Souleh’s commitment to excellence in every operational stage.

Video

Watch the Project in Action

Vide

Watch the Project in Action

For more, visit Lahij Souleh’s Instagram page and Aparat channel.

Latest Completed Projects

From Villas to Bridges, from Steel Sheds to Monumental Structures – All Bearing the Seal of Lahij Souleh Quality

Latest Completed Projects

From Steel Sheds to Grand Structures — Stamped with Lahij Souleh Quality

Fouman Shimi
Fouman Shimi