 Dorfak Shomal Steel Plant (Phase 2)
August 28, 2025
Fouman Shimi
August 29, 2025

Dorfak Shomal (Phase 3 & Phase 4)

Lahij Souleh Industrial Group

Infrastructure for Building Future

FOOLAD DORFAK SHOMAL
Dorfak Shomal (Phase 3 & Phase 4)

Dorfak Shomal (Phase 3 & Phase 4) Project

Dorfak Shomal Steel Plant (Ahanita Rebar) – Phase 3 & Phase 4

The Phase 3 of the Dorfak Shomal Steel Plant (Ahanita Rebar) was executed by Lahij Souleh in 2021 (1400). This phase featured one of the project’s most sophisticated structural design approaches—the use of tubular bracing systems with pin connections—a configuration that required exceptional precision throughout installation.

All steel components were pre‑fabricated in advance, enabling an organized and rapid on‑site assembly. The operation was completed with outstanding quality and within a 60‑working‑day timeframe, with final finishing completed in Mehr 1400 (October 2021).

Following the client’s satisfaction with Lahij Souleh’s engineering and execution standards, the company was awarded Phase 4, involving the construction of a 40‑meter‑span industrial steel hall used as the soil storage facility for the steel plant, weighing 220 tons. Fabrication was finished within 40 working days, and installation completed in only 15 working days.

Together, these two phases stand as a testament to Lahij Souleh’s technical capability, rapid execution, and exceptional commitment to quality, reinforcing the company’s position among leading executors of large‑scale industrial steel projects in Iran.

Structure Location: Guilan, Rasht

Structure Weight (tons): 600

Structure Type: Steel structure

Structure Usage: Industrial

Fabrication, Transportation & Installation: Lahij Souleh

Gallery

Latest Project Images

Gallery

Latest Project Images

Dorfak Shomal Steel Plant (Ahanita Rebar) – Phase 3 & Phase 4

The Phase 3 of the Dorfak Shomal Steel Plant (Ahanita Rebar) was executed by Lahij Souleh in 2021 (1400). This phase featured one of the project’s most sophisticated structural design approaches—the use of tubular bracing systems with pin connections—a configuration that required exceptional precision throughout installation.

All steel components were pre‑fabricated in advance, enabling an organized and rapid on‑site assembly. The operation was completed with outstanding quality and within a 60‑working‑day timeframe, with final finishing completed in Mehr 1400 (October 2021).

Following the client’s satisfaction with Lahij Souleh’s engineering and execution standards, the company was awarded Phase 4, involving the construction of a 40‑meter‑span industrial steel hall used as the soil storage facility for the steel plant, weighing 220 tons. Fabrication was finished within 40 working days, and installation completed in only 15 working days.

Together, these two phases stand as a testament to Lahij Souleh’s technical capability, rapid execution, and exceptional commitment to quality, reinforcing the company’s position among leading executors of large‑scale industrial steel projects in Iran.

Video

Watch the Project in Action

Vide

Watch the Project in Action
No video has been uploaded for this project yet. To watch more videos, please visit Lahij Souleh on Aparat.

For more, visit Lahij Souleh’s Instagram page and Aparat channel.

Latest Completed Projects

From Villas to Bridges, from Steel Sheds to Monumental Structures – All Bearing the Seal of Lahij Souleh Quality

Latest Completed Projects

From Steel Sheds to Grand Structures — Stamped with Lahij Souleh Quality

FOOLAD DORFAK SHOMAL
Dorfak Shomal (Phase 3 & Phase 4)