Mr. Tezval (Lahijan, Guilan Province)
The Mr. Tezval Project, launched in 2013 (1392) through direct collaboration with Lahij Souleh Industrial Company, was executed with the objective of constructing an entirely bolted steel structure.
With a total structural weight of 132 tons, the entire process—from engineering design to fabrication and installation—was completed inside Lahij Souleh’s facilities.
The utilization of standard bolted connection systems in this project ensured rapid installation, shortened construction time, and significantly improved structural stability and safety.
Throughout execution, Lahij Souleh’s engineering team maintained full compliance with technical standards, employing rigorous quality‑control procedures to deliver a reliable, durable, and high‑performance steel structure.
All stages—including accurate engineering design, in‑plant fabrication, secure transportation, and specialized on‑site erection—were performed in a coordinated and scheduled manner, achieving results fully aligned with the project timeline and client expectations.