Engineer Tavakolian (Niavaran, Tehran)
Initiated in 2020 (1399) as one of the landmark undertakings within Phase Two of Lahij Souleh’s Factory Operations in Rasht, this project reflects the company’s advanced capabilities in precision steel fabrication and assembly.
Within the Lahij Souleh facility, the steel structure fabrication and welding were executed with exceptionally high precision standards. Upon completing all technical stages, each structural component underwent comprehensive painting, not only enhancing visual refinement but also ensuring long-term durability against environmental factors.
After final preparation, the structure was transported to Niavaran, Tehran, where Lahij Souleh’s specialized erection team carried out on-site assembly and installation under rigorous safety and engineering standards.
With an impressive total steel weight of 800 tons, the project’s entire cycle—from design and production through erection—was managed and executed by Lahij Souleh Construction Company.
The integration of state-of-the-art technology, advanced equipment, and a highly experienced engineering team resulted in a project distinguished not only for its structural precision and robustness but also for its remarkable execution speed, making it a benchmark of technical excellence within Lahij Souleh’s professional portfolio.