translation
file-download
square-phone
INFRASTRUCTURE FOR BUILDING FUTURE
Head Office: Lahijan, 3rd Kilometer of Rasht Road 01342293030
Logo

INFRASTRUCTURE FOR
BUILDING FUTURE

SINCE 1997

National Hall 
August 27, 2025
Guilan Glove Company (Phase 1) 
August 27, 2025

Golestan 

Lahij Souleh Industrial Group

Infrastructure for Building Future

GOLESTAN
Golestan 

Golestan  Project

Project – Golestan Company Distribution Facility – Rasht–Qazvin Highway, Guilan Province – 2014 (1393)

The Golestan Company Project was developed with the purpose of constructing a fully mechanized hall for the distribution of food products across northern Iran. Located along the Rasht–Qazvin Highway, the project was launched in 2014 (1393) following the execution contract with Lahij Souleh Construction Company for the design, fabrication, and installation of an entirely bolted steel structure with a total structural weight of 650 tons and a main span of 60 meters.

A distinctive architectural and technical feature of this project lies in its three‑story administrative block, designed without intermediate columns and achieved through two 30‑meter truss spans. This unique design provided wide open floor areas and maximum functional flexibility, while demanding exceptional engineering precision, structural planning, and execution accuracy.

Throughout the project’s development, Lahij Souleh’s engineering and technical team supervised all phases—from detailed structural design and factory fabrication using advanced machinery, to transportation and on‑site erection—ensuring absolute compliance with safety, quality, and durability standards.

Given its scale, unique design, and execution excellence, the Golestan Company Distribution Hall stands among the benchmark industrial references in Lahij Souleh’s project portfolio.

Structure Location: Rasht–Qazvin Highway

Structure Weight (tons): 650

Structure Type: Steel

Structure Usage: Industrial

Fabrication, Transportation & Installation: Lahij Souleh

Gallery

Latest Project Images

Gallery

Latest Project Images

Project – Golestan Company Distribution Facility – Rasht–Qazvin Highway, Guilan Province – 2014 (1393)

The Golestan Company Project was developed with the purpose of constructing a fully mechanized hall for the distribution of food products across northern Iran. Located along the Rasht–Qazvin Highway, the project was launched in 2014 (1393) following the execution contract with Lahij Souleh Construction Company for the design, fabrication, and installation of an entirely bolted steel structure with a total structural weight of 650 tons and a main span of 60 meters.

A distinctive architectural and technical feature of this project lies in its three‑story administrative block, designed without intermediate columns and achieved through two 30‑meter truss spans. This unique design provided wide open floor areas and maximum functional flexibility, while demanding exceptional engineering precision, structural planning, and execution accuracy.

Throughout the project’s development, Lahij Souleh’s engineering and technical team supervised all phases—from detailed structural design and factory fabrication using advanced machinery, to transportation and on‑site erection—ensuring absolute compliance with safety, quality, and durability standards.

Given its scale, unique design, and execution excellence, the Golestan Company Distribution Hall stands among the benchmark industrial references in Lahij Souleh’s project portfolio.

Video

Watch the Project in Action

Vide

Watch the Project in Action
No video has been uploaded for this project yet. To watch more videos, please visit Lahij Souleh on Aparat.

For more, visit Lahij Souleh’s Instagram page and Aparat channel.

Latest Completed Projects

From Villas to Bridges, from Steel Sheds to Monumental Structures – All Bearing the Seal of Lahij Souleh Quality

Latest Completed Projects

From Steel Sheds to Grand Structures — Stamped with Lahij Souleh Quality

GOLESTAN
Golestan