translation
file-download
square-phone
INFRASTRUCTURE FOR BUILDING FUTURE
Head Office: Lahijan, 3rd Kilometer of Rasht Road 01342293030
Logo

INFRASTRUCTURE FOR
BUILDING FUTURE

SINCE 1997

قرارداد پروژه شرکت سیمکو در 18 مهرماه سال 1401 عقد شد. زمان تولید و همپوشانی ساخت، حمل و نصب مجموعا 60 روز کاری می باشد.
SIMCO
August 29, 2025
پروژه جناب آقای علیپور واقع در گلسار، یکی از نمونه‌های موفق اجرای سازه‌های شهری توسط تیم‌های متخصص است که با تلفیق دقت مهندسی و اجرای باکیفیت به ثمر رسیده است.
Alipour
August 29, 2025

Shadmanfa’at

Lahij Souleh Industrial Group

Infrastructure for Building Future

Shadmanfa’at
Shadmanfa’at

Shadmanfa’at Project

Shadmanfa’at Project – Golsar, Rasht, Guilan Province

The Shadmanfa’at Project, located in Golsar, Rasht, stands as one of the region’s prominent urban structures. With a total height of 37.3 meters and a distinctive design, it brings a modern and robust architectural character to the local cityscape.

The building comprises nine heavy roofs and one light roof, collectively covering a total floor area of 4,050 m². Execution required a steel structure weighing 370 tons, implemented in full compliance with structural engineering standards through precise material selection and the deployment of highly skilled construction teams.

This project showcases advanced technical capabilities, meticulous design precision, and high‑level execution management in delivering a stable and safe structure in one of Rasht’s key districts.

Structure Location: Guilan, Rasht

Structure Weight (tons): 370

Structure Type: Entirely bolted steel structure

Structure Usage: Residential

Fabrication, Transportation & Installation: Lahij Souleh

Gallery

Latest Project Images

Gallery

Latest Project Images

Shadmanfa’at Project – Golsar, Rasht, Guilan Province

The Shadmanfa’at Project, located in Golsar, Rasht, stands as one of the region’s prominent urban structures. With a total height of 37.3 meters and a distinctive design, it brings a modern and robust architectural character to the local cityscape.

The building comprises nine heavy roofs and one light roof, collectively covering a total floor area of 4,050 m². Execution required a steel structure weighing 370 tons, implemented in full compliance with structural engineering standards through precise material selection and the deployment of highly skilled construction teams.

This project showcases advanced technical capabilities, meticulous design precision, and high‑level execution management in delivering a stable and safe structure in one of Rasht’s key districts.

Video

Watch the Project in Action

Vide

Watch the Project in Action

For more, visit Lahij Souleh’s Instagram page and Aparat channel.

Latest Completed Projects

From Villas to Bridges, from Steel Sheds to Monumental Structures – All Bearing the Seal of Lahij Souleh Quality

Latest Completed Projects

From Steel Sheds to Grand Structures — Stamped with Lahij Souleh Quality

Shadmanfa’at
Shadmanfa’at